Pre-installation requirements of ZHY
1. Location
1.1. The unit should be located in a laboratory or clean industrial environment. The machine
should rest on a level and flat surface so that it will support the unit without shaking.
1.2. Never place the unit in a location where excessive heat, moisture, or corrosive materials
are present.
1.3. Equipment around is required 1.0 meter space for maintenance.
1.4. Ambient temperature: 10~40℃.2. Power supply
2.1. AC 380V/50Hz, 10A, 3-phase earth.
2.2. Power supply lead section≥1.5mm2, earth lead section≥1.0mm2.
2.3. For power supply, fluctuation of voltage≤10%, fluctuation of frequency≤0.5%, grounding
resistance of ground wire≤10Ω.
〈Attention〉It must install the protective grounding wire.
2.4. The length of unit power cable is 3 meters.
Type |
ZHY-401A |
ZHY-601A |
Dimension |
650*600*960 mm |
710*810*1080 mm |
Weight |
350kg |
420kg |
Pre-installation requirements of ZHM
1. Location
1.1. The unit should be located in a laboratory or clean industrial environment. The machine
should rest on a level and flat surface so that it will support the unit without shaking.
1.2. Never place the unit in a location where excessive heat, moisture, or corrosive materials
are present.
1.3. Equipment around is required 1.0 meter space for maintenance.
1.4. Ambient temperature: 10~40℃.
2.1. AC 380V/50Hz, 10A, 3- phase earth.
2.2. Power supply lead section≥1.5mm2, earth lead section≥1.0mm2.
2.3. For power supply, fluctuation of voltage≤10%, fluctuation of frequency≤0.5%, grounding
resistance of ground wire≤10Ω.
〈 Attention 〉It must install the protective grounding wire.
2.4. The length of unit power cable is 3 meters.
Type |
ZHM-1 |
ZHM-4 |
Dimension |
650*600*960 mm |
710*810*1080 mm |
|